Recuperation system in a fitness studio in Warsaw’s Wola district
Recuperation system in a fitness studio in Warsaw’s Wola district
The area of the object – 120 m.kw.
Projected volume of supplied air – 1350m /hour.
The facility consists of three halls of classes of different areas, a reception office and a checkroom with a bathroom.
The mechanical ventilation system with heat recovery based on Mitsubishi Electric Lossnay LGH-160RVX3-E recuperator having a capacity of 1600m/hr. The slightly higher capacity of the recuperator (1600m/hr instead of 1350m/hr in the design) allows it to operate at medium speed, which ensures quiet operation of the entire ventilation system.
The system consists of a recuperator, HAVACO supply air heaters, insulated steel spiro ducts, additional filters and silencers.
The cost of such a system, including installation – about PLN 60,000.00 net.